Finally bit of construction. The original bracket that held the header tank was a bit floppy so Richard welded up a new one – nice and solid now!
Plan A to hold the mesh in place on the nose cone – fibre glassed a set of nuts to on to it, then bolt it on. Final status – Epic Fail. The nuts pulled out.
Plan B (Richard came up with this one) Tubes fibre glassed into the nose cone!
Fibreglassed in place
All tubes installed
Some paint to clean up the work
Complete
Mesh installed with ZIP ties
Close up of the final mounting








