New parts! Conrod bolts, main bearing shells, big end shells, water pump, cam belt and piston rings.
Camshaft inserted New oil seal and o-ring for camshaft Rocker shafts and rockers on their way back into the head - the head needs to be propped up so there...
Got the head back from the machine shop on Friday, they took 4 thou off to remove the warp: Starting a bit of valve lapping 2 down only 10 to...
Silver is so last month, so blue it is this time! We used red hamerite on the exhaust plugs and those didn't discolour until we welded something on it -...
Cleaned up all the pistons today, but manage to snap one of the piston rings in the proces - doh! Andy, the chap who came up with the conversion severl...
Spacer machine down to size, about 17.90mm with in 0.1mm of the original. Cam belt pulley test fit, this a very tight fit so it will need the "the tool"...
Crank spacer taking shape on the lathe One step left is to machine down the spacer to the correct size - about 18mm
M20B25 piston fitted with M20B20 conrod and M52B28 crank! Moves well. Piston / conrod / crank combo at top dead centre - looks good :)
Puller-me-jig in place. The metal plate is bolted to the bit that needs to come off. In the middle a long bolt (out of an M52 block!) and a nut....
M52B28 crank shaft sitting in the M20 block - this end will need some kind of spacer for the oil seal. Crank sits in the block like it was meant...
The head is off to the local machine shop for crack testing, we'll know if everything is good on Tuesday. If it is then it'll get a bit of clean...
Rather than buying a new valve spring compressor we decided to make an extension for the curent one. After lathing the tube to the correct size with a suitable amount...